Email:
OurPlan@basalt.net
Phone:
(970) 927-4701
facebook
youtube
email
Home
Process
Timeline
Participation
Downtown Area Advisory Committee
Current Survey
Meeting Schedule
Results
Master Plan Amendment
Lowe Enterprises Proposal
DAAC Presentation
Ballot Results
Site Plan Options
Site Plan Details: Option One
Site Plan Details: Option Two
Site Plan Details: Option Three
Meeting Input
Viewpoints
Park Updates
FAQs
Go to…
Home
Process
-Timeline
Participation
-Downtown Area Advisory Committee
-Current Survey
-Meeting Schedule
Results
-Master Plan Amendment
-Lowe Enterprises Proposal
-DAAC Presentation
-Ballot Results
-Site Plan Options
-Site Plan Details: Option One
-Site Plan Details: Option Two
-Site Plan Details: Option Three
-Meeting Input
-Viewpoints
Park Updates
FAQs
Submit Your Drawing
Ballot : Vote For Your "Our Town" Vision
Voter Information Form
Email Address:
*
Age:
*
< 18 Years Old
18-30 Years Old
30-65 Years Old
> 65 Years Old
Gender:
*
Male
Female
Living Location:
*
Aspen Area
Basalt Area
Carbondale Area
Glenwood Springs Area
Other
Working Location:
*
Aspen Area
Basalt Area
Carbondale Area
Glenwood Springs Area
Other
Profession:
*
Architect, Designer
Construction
Developer, Banker, Investment
Downtown Property Owner
Government and Other Office
Homemaker
Retail, Restaurant, Other Commercial
Retired
Student
Teacher
Other
Checkbox
*
I certify that I will only vote once for my preferred site plan.
Vote For Your Vision of Downtown Basalt
The following Site Plan best represents what I would like to see for the Our Town Planning area in Downtown Basalt:
*
Site Plan One (
See Site Plan ONE Details
)
Site Plan Two (
See Site Plan TWO Details
)
Site Plan Three (
See Site Plan THREE Details
)
Section C
View of C : Looking West Down Midland Avenue
Option C1
Option C2 (Existing)
C: Of these two street views which do you prefer?
*
Option C1
Option C2
Section D
View of D : View From Town Hall
Option D1
Option D2
Option D3 (Existing)
D: Of these three street views which do you prefer?
*
Option D1
Option D2
Option D3
Section H
View of H : Four-Way Stop Facing South
Option H1
Option H2 (Existing)
H: Of these two street views which do you prefer?
*
Option H1
Option H2
Section J
View of J : Four-Way Stop Facing North
Option J1
Option J2 (Existing)
J: Of these two street views which do you prefer?
*
Option J1
Option J2
Section K
View of K : Four-Way Stop Facing East
Option K1
Option K2 (Existing)
K: Of these two street views which do you prefer?
*
Option K1
Option K2
Section M
View of M : Swinging Bridge Pathway
Option M1
Option M2 (Existing)
M: Of these two pathway views which do you prefer?
*
Option M1
Option M2
Additional Comments
Any additional comments or clarifications, please provide them here:
Anti-Spam Verification
Random Math Quiz. Please enter any two digits:
*
Example: 78
This box is for spam protection – <strong>please leave it blank</strong>:
View Meeting Drawings
See visions and ideas from past community meetings.
“Our Plan” Kick-Off Meeting
February 24, 2014 at the Basalt Regional Library
“Our Plan” Kick-Off Meeting
February 24, 2014 at the Basalt Regional Library
Copyright
©
2023
Town of Basalt
:: All Rights Reserved
Website Design
and
Graphic Design
by
Symbion Design
in Aspen and Basalt, Colorado